繁中 日本語 Plan a trip
Shirakawa-go in snow
Hokuriku · live cameras · Shirakawa-go, Takayama, Hakuba, Myōkō

Hokuriku live cameras

秋
Currently in season
AutumnOct–Nov
Now in Hokuriku · snow on the high peaks
Snow has settled at Murodō, and the Alpine Route closes on 30 November. Shirakawa-go has about 20 cm after snow on 20 to 22 November, with more forecast on 24 and 25 November.
春 夏 秋 冬

Is it snowing there right now? Official or public cameras I opened and saw working on 13 November 2026, from Shirakawa-go to the snow monkeys.

First snow this winter: Shirakawa-go, on the night of 19 to 20 November 2026 (1 cm on the ground at 23:00 on the 19th); Nagano city, 20 November. Kanazawa and Toyama: not yet, as of 23 November.

Shirakawa-go nowAbout 20 cm23 Nov 2026, after snow on 20 to 22 Nov; more forecast 24 and 25 Nov
First snow, usuallyEarly DecSettled snow from late December
Best time to look08:00–16:00JST, in daylight
From Taipei, HK, SingaporeJST minus 1 hSo 07:00–15:00 there
Shirakawa-go now
Not yet. Check the village camera at 11:00 JST (10:00 in Taipei, HK, Singapore).
First snow usually
Early December in the village; settled snow from late December.
Alpine Route
The Murodō camera runs until the route closes on 30 November 2026.
In brief

The list covers Shirakawa-go, Takayama, Shinhotaka, the Alpine Route, Hakuba, Myōkō, Nozawa, Shiga Kogen and the snow monkeys, then road cameras for drivers. Each says what it shows, whether it is video or a refreshing still, and when to look.

Stay for the snowWhere to stay

Tokyu Stay Hida-Takayama Musubi no Yu

2 min from the stationSee pricesCheck rates
01 · How to use this page

Check the camera, not the forecast

Daylight only. Most cameras are stills that refresh every few minutes, and at night they show lights or noise. In November and December the useful window is about 07:00 to 16:30 JST, which is 06:00 to 15:30 in Taipei, Hong Kong and Singapore (they are one hour behind Japan).

Video or still? Each row says. YouTube streams are video; most resort and road cameras are photos with a time stamp, so read the stamp before you decide it is snowing now.

For averages and the weekly status, see Is there snow in Shirakawa-go now? on the snow page. All links on this page go to the operators, with no booking links.

01 · Shirakawa-go

Shirakawa-go : the village camera

Snow on the ground. As of 23 November 2026 about 20 cm lies in the village after snow on 20 to 22 November, and more is forecast on 24 and 25 November. First snow usually comes in early December, with settled snow from late December. Snow now box

CameraWhat it showsVideo or stillBest time to lookLink
Shirakawa Village cameraA view down over the village from the hillside, car park in the corner. Run by the village office.Still image that refreshes08:00 to 10:00 JST for the first look at overnight snow, or 11:00 for the clearest picture (11:00 JST / 10:00 Taipei, HK, Singapore)Open the camera

The picture I opened was stamped 18:12 JST and showed the village lit at night, so it is a still that updates, not a video: look in daylight. I could not find an official camera on the Ogimachi viewpoint, and none on the village side of Gokayama (Ainokura and Suganuma). For the buses and light-up see Shirakawa-go light-up 2027.

Stay near Shirakawa-go
Gokayama base

Minshuku Goyomon

Ainokura village

Gasshō farmhouse in the middle of Ainokura, up to 6 guests in 3 tatami rooms. Iwana char grilled over the irori hearth, mountain vegetables and firm Gokayama tofu. Our notes

from¥15,000 ppCheck rates
Shibu · snow monkeys

Kanaguya

Shibu main street

The 1936 Saigetsurō widely linked to Spirited Away, eight baths and a guests-only building tour at 17:30. Minimum two per room.

¥18,700–¥42,900 ppCheck rates
02 · Takayama, Shinhotaka and Kamikochi

Takayama, Shinhotaka

Dusting at most. Takayama had 6 cm at most on 20 November, gone by the evening of the 21st; its first snow usually comes from late November to December, and it only settles from January (the deepest cover averages 44 cm in January). Check the town's forecast in the days before you go. Snow now box

CameraWhat it showsVideo or stillBest time to lookLink
Nakabashi bridge, TakayamaThe red Nakabashi bridge over the Miyagawa river, from the Hida Takayama tourism association.Live video (YouTube)Daylight, 07:00 to 16:30 JST; clearest in the morning (08:00 JST / 07:00 Taipei, HK, Singapore)Watch live
Shinhotaka RopewayThe ropeway's own live camera on its YouTube channel. The summit station is at 2,156 m, so snow comes here well before the valley. Maintenance closure on 24–27 November 2026: check the operator's page before you go.Live video (YouTube)Daylight, 08:00 to 16:00 JST (08:00–16:00 JST / 07:00–15:00 Taipei, HK, Singapore)Watch live Operator site
Kappabashi bridge, KamikochiKappabashi and the Hotaka peaks behind it, from Gosenjaku Hotel beside the bridge. Kamikochi is closed to visitors from 16 November 2026 until the spring opening (usually mid to late April; the 2027 date is not announced yet), so this is the only way to see it in winter.Live camera, 24 hours (the hotel warns it can stop without notice)Daylight, 08:00 to 15:00 JST (07:00–14:00 Taipei, HK, Singapore)Open the camera

The tourism association page also shows the Nakabashi feed. I could not find a live camera on the old town streets (Sanmachi) itself. Road cameras for the Hida area are in the driving section.

Stay in Takayama
Takayama base

Tokyu Stay Hida-Takayama Musubi no Yu

2 min from the station

Two minutes from the station, with a hot-spring bath. Takayama rooms book about three months ahead for 14–15 April and 9–10 October.

International

Mercure Hida Takayama

4 min from the station

International brand with a top-floor hot-spring bath: open-air, indoor and private baths.

03 · Tateyama Kurobe

Tateyama Murodō and the Alpine Route

Snow on the peaks already. Tateyama had its first snowcap on 27 October 2026. The Alpine Route closes on 30 November 2026, so these cameras show the last weeks of autumn and then the closed season. Snow now box

CameraWhat it showsVideo or stillBest time to lookLink
Murodō-daira, 2,450 mThe plateau at the top of the route, with a one-day time-lapse added every evening at about 21:30 JST.Image that refreshes, plus daily time-lapseDaylight until the route closes, 08:00 to 15:00 JST (08:00–15:00 JST / 07:00–14:00 Taipei, HK, Singapore)Open the camera
Daikanbō, Midagahara, KurobedairaThree more cameras on the operator's site: the ropeway station on the Kurobe side, the marshland plateau and the cableway stop.Camera pages (one per view)08:00 to 15:00 JST (08:00–15:00 JST / 07:00–14:00 Taipei, HK, Singapore)Daikanbō Midagahara Kurobedaira

The Kurobe Dam camera linked from that site refused our check, so we have left it out. We found no live camera at Unazuki or on the Kurobe Gorge Railway. Closing dates and the winter plan are on the Alpine Route guide and the Kurobe Gorge page.

Stay at Unazuki Onsen
Unazuki · onsen

Grandvrio Hotel Unazuki Onsen

5 min walk from Unazuki Onsen Station

Fully renovated and reopened in 2022. Rooms face the Kurobe Gorge, and the natural-spring bath has an open-air pool and a sauna. Unazuki Onsen stays open all winter, so it suits the night before the Winter Premium Tour.

from¥12,000 ppCheck rates
04 · Kanazawa and Toyama

Kanazawa

Rain before snow. Toyama's normal first snow is 3 December, and neither city had snow on the ground on 23 November. Kanazawa gets wet, patchy snow in January and February, and Kenrokuen's yukitsuri ropes went up on 1 November. Snow now box

CameraWhat it showsVideo or stillBest time to lookLink
Ishikawa road camerasNational route cameras around Kanazawa and the Noto approach, from the Kanazawa national highway office.Still images that refreshAny daylight hour; roads matter most 06:00 to 09:00 JST (06:00–09:00 JST / 05:00–08:00 Taipei, HK, Singapore)Open the cameras
Toyama road camerasRoad and weather cameras across Toyama Prefecture, run by the prefecture.Still images that refreshAny daylight hour (06:00–09:00 JST / 05:00–08:00 Taipei, HK, Singapore)Open the cameras

I could not find an official live camera on Kenrokuen, Higashi Chaya, Kanazawa Station, Toyama Station or Toyama Bay. Kenrokuen's own "live tour" page is a past Zoom walk, not a camera. The road cameras are the closest live view of the weather in both cities.

Stay in Kanazawa or Toyama

First Hotel Kanazawa

Adjacent to 21st Century Museum + 4 min to Crafts Museum

Walking distance to Hon-Tamachi's craft cluster (Kanazawa-Craft Hirosaka, Kaga-Yuzen Kaikan, Yasue Gold Leaf Museum) and three minutes from Kenrokuen for the morning garden. Our notes

from¥14,000Check rates
Start in Toyama

Hotel Vischio Toyama by GRANVIA

in the JR Toyama Station building

Upper floors of the station building: roll out of bed and onto the 8:29 Kagayaki. Our notes

from¥11,500Check rates
05 · Hakuba

Hakuba

Snow on the slopes, and the first lifts are running. The valley station reached 51 cm on 22 November. Goryu and Hakuba47 opened on 21 November and Happō-One on 21 and 22 November (one slope or lift area each); Tsugaike opens on 1 December, Cortina and Norikura on 12 December and Iwatake on 18 December. Snow now box

CameraWhat it showsVideo or stillBest time to lookLink
Happō-OneFour cameras on the resort's page: the Alpen Quad (1,678 m), Usagidaira (1,391 m), the gondola base (770 m) and Car Park 3 (737 m).Camera images on the resort page; check each time stamp08:00–16:00 JST / 07:00–15:00 Taipei, HK, SingaporeOpen the cameras
TsugaikeFive views: the gondola and ropeway top stations, the Hakuba Sanzan view from the nature park (1,900 m), the Kane no Naru Oka slope and the central car park.Mixed: images and a video stream08:00–16:00 JST / 07:00–15:00 Taipei, HK, SingaporeOpen the cameras
Hakuba Valley snow reportNot a camera: snow depth, weather and lift status for every resort in the valley, from the tourism association.Updated reportMorning, before you choose a resort (07:00 JST / 06:00 Taipei, HK, Singapore)Open the report

We found no official camera page for Goryu, Hakuba47 or Cortina; the valley snow report covers them. More on the slopes and tickets: Hakuba ski guide.

Stay in Hakuba
Ski-in, ski-out

Hotel Green Plaza Hakuba

foot of Cortina

Ski-in, ski-out at the foot of Cortina, with its own hot spring (11 baths) and a free shuttle from Minami-Otari. A swap for night 1 if you start at Itoigawa and ski Cortina. Our notes

from¥9,260 ppCheck rates
06 · Myōkō

Myōkō: Akakura, Ikenotaira, Suginohara

Deep snow comes early here. Akakura Onsen lift tickets start on 12 December and Akakura Kankō, Ikenotaira and Suginohara open on 19 December 2026. Myōkō averages 172 cm at the deepest in January. Snow now box

CameraWhat it showsVideo or stillBest time to lookLink
Myōkō Kogen webcam listResort stills from Akakura Kankō, Ikenotaira and Suginohara, plus road cameras. A local visitor guide gathers them; each image belongs to its host site and some are off in summer.Still images that refresh08:00–16:00 JST / 07:00–15:00 Taipei, HK, SingaporeOpen the list
Niigata Prefecture road camerasRoad cameras for Jōetsu and Myōkō, including the expressway and the roads up to Akakura.Still images that refreshAny daylight hour (06:00–09:00 JST / 05:00–08:00 Taipei, HK, Singapore)Open the cameras

The resort cameras themselves sit on third-party hosting, so I link the list rather than one image. More: Myōkō ski guide.

Stay in Akakura
Historic · 1937

Akakura Kankō Hotel

above the Akakura Kankō slopes

One of Japan's first ski-resort hotels (1937), at 1,000 m above the Akakura Kankō slopes. Sulphur onsen and views to Lake Nojiri. Our notes

historic hotelCheck rates
07 · Nozawa Onsen

Nozawa Onsen

Early skiing from 28 November. Winter operation is planned from 28 November 2026, the regular period starts on 19 December, and Nozawa averages 171 cm at the deepest in January and 199 cm in February, so the slope cameras are worth watching from early December. Snow now box

CameraWhat it showsVideo or stillBest time to lookLink
Nozawa Onsen Ski Resort camerasSeven views on the resort's own camera map: Yamabiko D course and top, Uenotaira, Nagasaka, Hikage, Karasawa and Paradise.Still images stamped with their update time08:00–16:00 JST / 07:00–15:00 Taipei, HK, SingaporeOpen the camera map

We confirmed the images were updating, in the middle of the night, before the season opens. More: Nozawa Onsen guide.

Stay in Nozawa Onsen
Views

Nozawa Grand Hotel

Hotel

Three bath halls on the Shin-yu and Ogama sources, and wide views over the valley.

08 · Shiga Kogen

Shiga Kogen

Two areas open, the rest from 5 December. Yokoteyama and Kumanoyu opened on 21 November, and Shiga Kogen’s common ticket runs 5 December 2026 to 5 May 2027, one of the longest seasons in the region. Snow now box

CameraWhat it showsVideo or stillBest time to lookLink
Shiga Kogen camera indexThe tourism association's page of views: Hasuike crossing, the Higashi-Tateyama and Nishi-Tateyama slopes, Ichinose and the Yokoteyama summit.Camera pages, one per view08:00–16:00 JST / 07:00–15:00 Taipei, HK, SingaporeOpen the index
Kumanoyu ski areaThe Kumanoyu Onsen ski area's own live stream.Live video (YouTube)08:00–16:00 JST / 07:00–15:00 Taipei, HK, SingaporeWatch live

Shiga Kogen's road camera for the approach is in the northern Nagano list below. More: Shiga Kogen guide.

Stay in Shiga Kogen
Ski-in, ski-out

Shiga Kogen Prince Hotel

Yakebitaiyama · ski-in

The resort hotel at the foot of Yakebitaiyama, with lift ticket counters in the East and West lobbies. The South wing is due to open 4 December 2026, the West wing 18 December and the East wing 19 December (planned).

resort hotelCheck rates
09 · Snow monkeys

Jigokudani snow monkeys

Snow-capped faces from January. Entry is ¥1,000 from 1 December 2026 (¥800 until 30 November), 9:00–16:00 in winter, and the monkeys usually come down between 9:00 and 10:00. Snow now box

CameraWhat it showsVideo or stillBest time to lookLink
Monkey Park live videoThe official live video of the park, with a start button on the page.Live videoThe monkeys come down about 09:00 to 10:00 JST (09:00–10:00 JST / 08:00–09:00 Taipei, HK, Singapore)Open the video
Monkey Park still imageThe same camera as a still with an archive of past images, linked from the park's home page.Still image that refreshesSame hours (09:00–10:00 JST / 08:00–09:00 Taipei, HK, Singapore)Park home page

At 03:50 JST the picture was night-vision noise, because the park is closed and the monkeys have gone up the cliff, but the feed was connected. Details and the trail: Yudanaka and Shibu.

Stay in Shibu Onsen
Onsen night

Shibu Onsen Kokuya

Shibu Onsen lanes · 9.4

An old inn on Shibu's lantern-lit main street, with the town's nine public baths on the doorstep.

ryokan, 2 mealsCheck rates
10 · Road cameras

Driving to Shirakawa-go, Takayama and the ski areas

Road cameras show wet or snowy tarmac before you set off. These are the road authorities' own pages; the ones in this table are stills or closure maps, not video.

CameraWhat it showsVideo or stillLink
Hida area road cameras (MLIT Takayama office)National roads around Takayama, Gero and Kamioka, Takayama IC and the Abo Tunnel at Hirayu on the road to Matsumoto.Still images, refreshed every 15 minutesOpen the cameras
Gifu Prefecture road informationClosures and cameras for the roads Gifu manages, which include sections of national routes 156 and 158 on the way to Shirakawa-go.Closure map and camera stillsOpen the site
Shirakawa Village winter closuresThe village's notices for the roads it lists, such as national route 360 and prefectural route 451. The village office is on 05769-6-1311.NoticesRoute 360 Route 451
NEXCO Central Japan iHighwayExpressway closures, chain rules and cameras. Open the Tokai map for the Gifu end of the Tōkai-Hokuriku Expressway and the Hokuriku map for the Toyama end.Map with camera stillsOpen iHighway
Chubu winter driving guide (MLIT)The regional bureau's winter road page: closure lists and links to camera sites across Gifu, Nagano and the rest of Chubu.Guide and linksOpen the guide
Hokuriku snow navigation (MLIT)Winter road status for Toyama, Ishikawa and Niigata.Status pagesOpen the pages
Northern Nagano road camerasRoad and weather cameras on the approaches to Shiga Kogen, Nozawa Onsen and Hakuba.Still images that refreshOpen the cameras

A car needs 4WD and winter tyres in snow, and roads close in heavy storms. Buses are the easier option: see getting around in snow.

11 · What I could not find

Not on this page, and why

  • Gokayama (Ainokura, Suganuma): no official camera.
  • Kenrokuen, Higashi Chaya, Kanazawa Station, Toyama Station, Toyama Bay: no official camera; use the road cameras above.
  • Kurobe Dam: the Alpine Route site links it, but it refused our check, so it is left out.
  • Goryu, Hakuba47, Cortina: no official camera page; the Hakuba Valley report covers them.
  • Unazuki and the Kurobe Gorge Railway: no camera found.
  • Amaharashi coast (Tateyama across Toyama Bay): no official camera found (checked 14 November 2026).
12 · FAQ

Hokuriku live cameras, quick answers

Is there a live camera of Shirakawa-go?

Yes, a still that refreshes: the Shirakawa Village camera, a view down over the village from the hillside. It is a photo, not a video, so look in daylight, from about 08:00 JST (07:00 in Taipei, Hong Kong and Singapore). We found no official live camera on the Ogimachi viewpoint. For the daily picture, see the Shirakawa-go section.

Is it snowing in Hakuba now?

Check the resort cameras: Happō-One has four, Tsugaike five, and the Hakuba Valley snow report gives depth and lifts for each resort. Happō-One reported its first snow on 28 October 2026 and opened one slope on 21 and 22 November, and Goryu opened on 21 November. The latest is in the Snow now box.

Is there a Kanazawa live camera?

I could not find an official one for Kenrokuen, Higashi Chaya or Kanazawa Station on 13 November 2026. The closest live view of the weather is the Ishikawa road cameras. Kanazawa gets wet, patchy snow mostly in January and February, and Kenrokuen's yukitsuri ropes went up on 1 November.

How do I check road conditions to Shirakawa-go?

Use the Gifu Prefecture road site for closures and cameras, the MLIT Hida cameras (refreshed every 15 minutes) for the Takayama side, and iHighway for the Tōkai-Hokuriku Expressway. The village posts winter closures at its site. By car you need 4WD and winter tyres; the buses are easier.

Is there a live camera in Takayama?

Yes: the Hida Takayama tourism association streams the Nakabashi bridge live on YouTube, and we confirmed it was live on 13 November 2026. We found none on the old town streets. The Shinhotaka Ropeway live camera is also on YouTube; the ropeway has a maintenance closure on 24–27 November 2026.

What time should I look from Taiwan, Hong Kong or Singapore?

Japan is one hour ahead of all three, so subtract one hour from JST. Most cameras are only useful in daylight, about 07:00 to 16:30 JST in November and December, which is 06:00 to 15:30 in Taipei, Hong Kong and Singapore. For fresh overnight snow look at 08:00 JST (07:00); for the clearest picture, 11:00 JST (10:00).

Can I watch the Jigokudani snow monkeys live?

Yes, on the park's official live video page, which has a start button. The monkeys usually come down between 09:00 and 10:00 JST (08:00 to 09:00 in Taipei, Hong Kong and Singapore). At night the picture is only noise.

13 · Continue planning

More winter planning

Snow in HokurikuMonth by month, with the weekly snow box
Shirakawa-go light-up 2027Dates, buses and booking
Where to stay to see Shirakawa-go in snowTakayama, Kanazawa or the village
Where to ski in HokurikuHakuba, Myōkō, Nozawa and Shiga Kogen

Booking links are affiliate links: we may earn a commission, at no extra cost to you. How we choose